Ming Lee Foundation Company Limited was found in 2007. In 10 short years, we have grown up to be a company with scale and is capable to take up mid to large scale foundation and site formation project. With the use of our own machineries and technologies, we are able to provide a wide range of foundation works to our customer, including Large Diameter Bored Pile, Driven H-pile, Pre-bored Socket H-pile, mini-piles, large scale Excavation and Lateral Support Works. Our project team consists of professional in various field and we will deliver the best service with quality assurance.
The works comprise of over 8000m of driven steel bearing piles, where heavy machine of hydraulic hammer and drop hammer piling rigs are employed for installation of the piles. The pile cap system involved approximate 1600m3 concrete, 100 ton steel sheet pile as the temporary earth supporting system and 17000m3 excavation works. The project was implemented with environmental requirement of HK BEAM Plus.

The works comprise of over 8000m of driven steel bearing piles, where heavy machine of hydraulic hammer and drop hammer piling rigs are employed for installation of the piles. The pile cap system involved approximate 1600m3 concrete, 100 ton steel sheet pile as the temporary earth supporting system and 17000m3 excavation works. The project was implemented with environmental requirement of HK BEAM Plus.


Over 8000m of pipe pile are constructed and around 55,000 of excavated material, in which around 50000m3 of rock are broken up with heavy duty rock breaker. Telescoping excavator for deep excavation. The project was implemented with environmental requirement of HK BEAM Plus.

Over 8000m of pipe pile are constructed and around 55,000 of excavated material, in which around 50000m3 of rock are broken up with heavy duty rock breaker. Telescoping excavator for deep excavation. The project was implemented with environmental requirement of HK BEAM Plus.