Scope of Works:

  • 21 nos. of bored piles with 2m and 2.5m diameter average 30m depth
  • ELS works including sheet pile wall installation, excavation and shoring installation
  • Pile cap construction works

Contract Sum:

  • $66.8M

Contract Period:

  • April 2016 to October 2017

Successfully liaise with TD and RMO for TTM along cycling track at Wong Chu Road, which no proper access to site area was given at the beginning. Jet grouting method is adopted to strengthen the marine deposit layer. The project was implemented with environmental requirement of HK BEAM Plus.