Job References
9724d5eb-150c-4019-a482-a82ea5b342ea
TPTL 223 & 229, LO FAI ROAD, TAI PO
PROJECT SUMMARY

Scope of Works:

  • 180 nos. of socketed H-piles average 15m depth
  • ELS works including pipe pile wall installation and king post, excavation and shoring installation.
  • Footing, pile cap and basement wall construction works.
  • 2600 nos. of tree felling works.

Contract Sum:

  • $170M

Contract Period:

  • September 2018 – November 2019

Around 180,000m³ of soil & rock are excavated with 2,000m³ of material disposed daily. The project was implemented with environmental requirement of HK Beam plus.