Job References
200819_King Fuk St._001
PROJECT SUMMARY

Scope of Works:

  • Installation of piles as piling foundation.
  • ELS works including sheet piling and open excavation for construction of reinforced concrete pile cap and tie beam / strap beam.
  • Construction of Pile Cap System.

Contract Sum:

  • $50.9M

Contract Period:

  • November 2019 - February 2021

The works comprise of over 8000m of driven steel bearing piles, where heavy machine of hydraulic hammer and drop hammer piling rigs are employed for installation of the piles. The pile cap system involved approximate 1600m3 concrete, 100 ton steel sheet pile as the temporary earth supporting system and 17000m3 excavation works. The project was implemented with environmental requirement of HK BEAM Plus.