Job References

PROJECT SUMMARY
Contract Sum:
- $ 37M
Contract Period:
- September 2020 to November 2021
Scope of works:
- 6 nos. of bored piles with 2.0m diameter
average 40m depth. - ELS works including sheet piling installation
And excavation and shoring installation.
- Pile cap works.
SNAPSHOT



