PROJECT SUMMARY

 

Contract Sum:

  • $ 37M

 

Contract Period:

  • September 2020 to November 2021

Scope of works:

  • 6 nos. of bored piles with 2.0m diameter
    average 40m depth.
  • ELS works including sheet piling installation
    And excavation and shoring installation.
  • Pile cap works.