Job References

PROJECT SUMMARY
Contract Sum:
- $ 158.3M
Contract Period:
- August 2020 –February 2022
Scope of Works:
- ELS works including pipe pile wall installation
and grout curtain, excavation and shoring
installation. - 14 nos. of bored piles with 3.0m diameter
average 45m depth. - 23 nos. of mini-piles with 2.73m diameter
average 35m
SNAPSHOT






