工程项目
WhatsApp Image 2021-04-01 at 12.36.10 PM (2)
项目摘要

工程范围:

  • 4 nos. of bored piles with 2.5m diameter average 25m depth
  • ELS works including pipe pile wall installation and grout curtain, excavation and shoring installation.
  • Pile cap works

工程总额:

  • $23M

合约工期:

  • April 2021 to February 2022

钢结构平台设计同时巩固地基基础和建筑工程。 该项目符合HK BEAM Plus的环保要求。