工程项目
项目摘要
工程总额:
- $ 37M
合约工期:
- September 2020 to November 2021
工程范围:
- 6 nos. of bored piles with 2.0m diameter
average 40m depth. - ELS works including sheet piling installation
And excavation and shoring installation.
- Pile cap works.
快照
工程总额:
合约工期: