工程项目
2819a9e64234480a9794b97264f8492
项目摘要

 

 

工程总额:

  • $ 158.3M

 

合约工期:

  • August 2020 –February 2022

 

工程范围:

 

  • ELS works including pipe pile wall installation
    and grout curtain, excavation and shoring
    installation.
  • 14 nos. of bored piles with 3.0m diameter
    average 45m depth.
  • 23 nos. of mini-piles with 2.73m diameter
    average 35m