項目摘要

工程範圍:

  • 6 nos. of bored piles with 3.0m diameter average 40m depth
  • ELS works including pipe pile wall installation and grout curtain, excavation and shoring installation.
  • Pile cap and basement wall construction works

工程總額:

  • $59.5M

合約工期:

  • September 2018 – December 2019

鋼結構平台設計同時鞏固地基基礎和建築工程。 該項目符合HK BEAM Plus的環保要求。